Category
Hot DIP Galvanized Pipe T Clamp for Formwork Farm Metal Stamping Parts
Product Description Same Type of Product EMAX Capability 1.Press:Our stamping machine is from 5Ton to 400Ton(Our max pun
Basic Info.
Model NO. | 97 |
Transport Package | Carton, Plt |
Specification | customized size |
Trademark | EMAX |
Origin | Zhejiang, China |
HS Code | 7308900000 |
Production Capacity | 2000pieces/Month |
Product Description
Product DescriptionProduct Name: | Utility Pole Line Hardware |
Material: | Steel/Stainless steel/Alumium/Brass/Copper |
Surface Treatment: | Hot dip galvanized/Powder coating/Zinc Plated/Nickel Plated/Heat treatment/Chrome Plateing/Electrophoresis/Blackening/PVC coating etc. |
Size: | OEM Customized |
Processing: | Stamping/Punching/Bending/Tapping/Milling/Lathe/Welding/Assembly/Laser cutting |
Grade: | First Class |
Thread: | Coarse,Fine |
Certification: | ISO9001,SGS,CTI,ROHS |
Industry: | Utilities,Power,Overhead construction,Pole line hardware,Line fitting |
Country of origin: | China |
EMAX Capability1.Press:Our stamping machine is from 5Ton to 400Ton(Our max punch 400Ton),we can stamp steel with 12-16mm thickness.2.Finish we always do:Hot dip galvanized,Zinc Plated,Nickel Plated,Chrome Plated,E coating(electrophoresis),Powder coating,Polish for Stainless steel,Anodizing for Aluminum,and pickling for copper/brass.3.Material we always use:Q235B steel(S235 in EU),Q345 steel(S355 in EU),Q500 steel(S500 in EU),DC01/SPCC cold rolled steel,Aluminum(6061 or 5053),Copper(T1).4.Welding and assembly:Hand and Robot Welding,Arc Welding,Co2 protection Welding,or Aluminum Welding.5.Progressive tooling:We can make progressive mould by ourselves.etc.Factory Packing&DeliveryCustom PhotoFAQ:
Q: Are you trading company or manufacturer ?
A: We are factory.
Q: How long is your delivery time?
A: Generally it is 5-10 days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is according to quantity.
Q: Do you provide samples ? is it free or extra ?
A: Yes, we could offer the sample for free charge but do not pay the cost of freight.
Q: What is your terms of payment ?
A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.
If you have another question, pls feel free to contact us as below: